WHITCOMB BAYOU SHORELINE IMPROVEMENTS
The City is seeking to upgrade the shoreline around Whitcomb Bayou to address storm surge and tidal flooding. To accomplish this, the shoreline elevation must be raised. This can be accomplished in several ways, and our experts have prepared three alternatives. The city would like to know if YOU have a preferred option. The three alternatives consist of (1) a concrete barrier wall, (2) raising the elevation of the road (South Spring and Whitcomb Boulevards), and (3) constructing an earthen berm between the shoreline and the existing roadway, or combinations of all of these.
Please take the survey below to let us know which alternative (or combination of alternatives) you would like to see constructed!
Option 2 - Raise the Roadway Elevation (3 photos below)
Option 3 - Build a Raised Berm (3 photos below)
Full sized images are available for download in the 'Documents' section on the right of this webpage. * A combination of all of the above options may also be considered.
SOUTH SPRING BLVD / MLK DRIVE INTERSECTION IMPROVEMENTS
The City is seeking to upgrade the intersection of MLK Drive and South Spring Boulevard. Upgrades would include raising the elevation of the intersection to help reduce roadway flooding, adding an improved stormwater drainage system, and improving pedestrian and motorist safety by reconfiguring the intersection. The City wants to know which configuration YOU would prefer, a roundabout or a 4-way stop. Both options would include the previously listed improvements.
Please take the surveybelow to let us know which option you would like to see constructed!
Option 1: Roundabout
Option 2: 4-Way Stop
Full sized images are available for download in the 'Documents' section on the right of this webpage.
The City is working on two projects around Whitcomb Bayou and is looking for your input! Please review each project description below and take the survey to share your preferences with the City!
WHITCOMB BAYOU SHORELINE IMPROVEMENTS
The City is seeking to upgrade the shoreline around Whitcomb Bayou to address storm surge and tidal flooding. To accomplish this, the shoreline elevation must be raised. This can be accomplished in several ways, and our experts have prepared three alternatives. The city would like to know if YOU have a preferred option. The three alternatives consist of (1) a concrete barrier wall, (2) raising the elevation of the road (South Spring and Whitcomb Boulevards), and (3) constructing an earthen berm between the shoreline and the existing roadway, or combinations of all of these.
Please take the survey below to let us know which alternative (or combination of alternatives) you would like to see constructed!
Option 2 - Raise the Roadway Elevation (3 photos below)
Option 3 - Build a Raised Berm (3 photos below)
Full sized images are available for download in the 'Documents' section on the right of this webpage. * A combination of all of the above options may also be considered.
SOUTH SPRING BLVD / MLK DRIVE INTERSECTION IMPROVEMENTS
The City is seeking to upgrade the intersection of MLK Drive and South Spring Boulevard. Upgrades would include raising the elevation of the intersection to help reduce roadway flooding, adding an improved stormwater drainage system, and improving pedestrian and motorist safety by reconfiguring the intersection. The City wants to know which configuration YOU would prefer, a roundabout or a 4-way stop. Both options would include the previously listed improvements.
Please take the surveybelow to let us know which option you would like to see constructed!
Option 1: Roundabout
Option 2: 4-Way Stop
Full sized images are available for download in the 'Documents' section on the right of this webpage.
Please share your preferred options for the Whitcomb Bayou Shoreline and MLK Drive Intersection Improvements!
Consultation has concluded
Share Whitcomb Bayou Shoreline and MLK Intersection Improvements Survey on FacebookShare Whitcomb Bayou Shoreline and MLK Intersection Improvements Survey on TwitterShare Whitcomb Bayou Shoreline and MLK Intersection Improvements Survey on LinkedinEmail Whitcomb Bayou Shoreline and MLK Intersection Improvements Survey link
Signup Banner
Levels of Engagement
INFORM - Provide information and updates to the community.
CONSULT - Gather ideas, feedback, and opinions from the community.
INVOLVE - Work directly with the community throughout the planning process.